Requirements and Environmental Design for LCD Splicing Wall
Number of views:1818order Release Date:2020-11-26
To ensure the smooth implementation of the LCD splicing wall construction project and the normal operation of the system equipment, the construction of the equipment must meet the following environmental conditions:

1、 Power supply

Considering that the system may encounter special situations where there may be a current surge due to the interruption of power supply, the splicing unit itself has a power protection design to ensure the normal and safe operation of the equipment.

1. The power supply voltage should be stable and reliable, especially to prevent immediate power up after power failure. Therefore, in principle, the power supply of the splicing system must be powered by a corresponding power UPS.

2. The splicing system, image controller, and control PC require in-phase power supply.

3. The system equipment should have good grounding, with a grounding resistance of less than 2 Ω, to ensure that the equipment is not damaged in the event of special conditions such as lightning strikes.

4. The power supply of the system is AC 220V ± 5%; Use a three eye socket with a protective grounding wire; The number of sockets is related to the number of splicing units

2、 Light requirements

1. If the windows in the control room are large, direct sunlight should be avoided and curtains should be used to block the light. The curtains should be dark in color.

2. It is recommended to use recessed tube lights for lighting. The lights should not be directly aimed at the screen direction and should be kept at a distance of 3 meters from the screen to avoid affecting the projection effect.

3、 Air conditioning requirements

1. There should be good temperature control and heat dissipation measures in the maintenance channel behind the splicing screen panel. If it is a central air conditioning system, there should be air conditioning inlet and outlet ports. If there is no central air conditioning system, specialized air conditioning should be added, and the power of the air conditioning system depends on the size of the large screen.

2. The temperature inside the maintenance channel and the temperature in the control room of the splicing curtain wall should be controllable and kept basically the same.

4、 Installation requirements

② The cabinet base is usually in direct contact with the anti-static floor to ensure that the ground can withstand gravity for a long time without deformation.

① The installation ground requires a flat and sturdy surface, strong load-bearing capacity, and is not easily deformed.

5、 Requirements for wiring and trunking

1. If it is a fixed floor such as floor tiles or composite wood flooring, it is required that there is a wiring groove between the signal source (computer RGB signal, video signal) and the control computer to the graphics controller (or projector interface), and the shorter the wiring distance, the better.

2. Weak current cables (RGB, video, network, serial port, mouse and keyboard extension cables, etc.) should be routed separately from strong current cables to avoid signal interference. If using cable trays, it is not possible to share one cable tray, and different cable trays should be used for separate wiring.

3. If it is an anti-static floor, holes should be opened at the wiring outlet to leave cable outlets.

6、 System environment

1. The temperature and humidity of the air conditioner before and after splicing the screen should be adjusted to the same scale to ensure the heat dissipation of the splicing wall and the flatness of the splicing screen

2. The fire sprinkler shall be as far away from the splicing wall as possible, and spray extinguishing agent shall be used.

3. The splicing curtain wall room requires cleanliness and dust prevention.

4. The back of the splicing system is a maintenance channel, and the width of the maintenance channel is generally not less than 0.60 meters

5. Large screen rooms require good temperature and humidity control. The working environment temperature is 0 ℃ -40 ℃, and the relative humidity is 10% -90%. There should be air conditioning behind the spliced curtain wall.

7、 Requirements for decoration and equipment location of operation console (room)

1. The placement of the image controller should be located in the aisle (inside the cabinet) next to or behind the curtain wall, and should be as close as possible to the projection box

2. The control computer should be located as close as possible to the opposite direction of the splicing screen and at a suitable distance from it for debugging, color adjustment, and other operations.

3. The position of the operation control computer should be directly opposite the splicing screen, and it is required that the operator can easily and intuitively see the operation of the splicing screen. If there is a dedicated partitioned operation control room, there should be transparent glass between the operation control room and the large screen display room for easy viewing by the operator.


Contact Us
Address: Building B, Lihao Yongda Technology Park, No.1 Dongfang Avenue, Guangming District, Shenzhen
Phone: 0755-23576861
24-hour service hotline: 139 2371 0018

QR code
CopyRight ? 2017 Shenzhen Jintong Display Technology Co., Ltd. All Right Reserved
展開
  • Tel

  • 075523576861
QR code
校园 春色 欧美 另类 小说| 亚洲AV无码乱码精品裸果| 你懂的亚洲一区| free性白嫩少妇XXXXHD | 日韩免费福利| 人妻av网站| 天美传奇传媒| 午夜欧美性爱| 午夜福利一二三区| 久久久久无码精品国产安然| 老色69久久九九精品 | 国产精品久久毛片老年| 影音av资源| 久久久亚洲免费观看视频| 91精品久久久久久综合| 亚洲av一二三区成人影片| 久久久久久蜜臀| 影音先锋国产无码| 宅男在线永久免费观看网直播| 无夜无码AV| 成人影院永久免费观看网址| www.四虎| 欧美三级视频| 中文成人无字幕乱码精品区| 亚洲人成无码久久久久| 久久99精品国产99久久| 国产人成在线观看| 手机在线视频你懂的| 日本在线二区| 国产精品一区二区三区人人爽日韩精品人人模 | 大j8黑人w巨大888a片| 免费人妻精品一区二区三区鼻钩| 激情五月开心婷婷| 久久精品免费一区二区喷潮| 女明星裸体看个够(无遮挡)| 日韩免费AV一区二区| 一个人看的视频www在线观看免费 国产精品爽爽久久久久久 | 狠狠躁夜夜草| 激情另类视频| 国产欧美日韩一区二区加勒比| 国产精品禁18久久久久久|